![](https://coverac.ca/wp-content/uploads/2021/01/front-of-building-1200x675.jpg)
![](https://coverac.ca/wp-content/uploads/2021/01/back-of-building-1-1200x675.jpg)
![](https://coverac.ca/wp-content/uploads/2021/01/side-of-building-1200x675.jpg)
![](https://coverac.ca/wp-content/uploads/2021/01/wood-joints-1-1200x675.jpg)
![](https://coverac.ca/wp-content/uploads/2021/01/Untitled-1-1200x675.jpg)
![](https://coverac.ca/wp-content/uploads/2021/01/int.-one-1-1200x675.jpg)
The Elkford Municipal Hall is a Design Build project in conjunction with Scott Builders from Calgary Alberta. Elkford has needed a new hall for some time, and after looking at a variety of options, the design/build procurement model met all their expectations. The project exceeds the NECB energy requirements, particularly around Air Tightness.